Planning Ahead for Ward

Streets, Roads & Infrastructure

For months, I have been listening to residents and personally visiting streets throughout Ward to better understand the problems they are experiencing. I’ve also spoken with city leadership about the history of some of these roads and shared concerns I discovered along the way.

One thing has become very clear to me:

we need to move from a reactive approach to a preventative one.

Too often, we repair what we can see without identifying why the same road, drainage area, shoulder, or ditch continues to fail. That may provide a temporary fix, but it doesn’t necessarily solve the underlying problem—and taxpayers ultimately pay for it again.

My Goal: A Ward Master Road & Infrastructure Plan

Rather than waiting for the next problem, I want Ward to develop a comprehensive plan that evaluates our streets and establishes priorities, estimated costs, and a realistic timeline for improvements.

That plan would include:

  • Professional street assessments. When necessary, seek engineering or other professional guidance before requesting bids so we know exactly what problem needs to be corrected—not simply what surface needs to be repaired.

  • A street-by-street evaluation. Document pavement condition, drainage, shoulders, right-of-way, traffic volume, safety concerns and recurring maintenance problems.

  • Fix the cause, not just the symptom. Identify locations where drainage, erosion, inadequate base material or another underlying issue may be causing repeated failures.

  • A transparent maintenance schedule. Develop short-, mid- and long-term priorities so residents can see where their street falls within the plan and understand why.

  • Safer older streets. Evaluate narrow roads such as Balding, Milam, Campbell and other areas where increased development has placed additional traffic on roads that were never designed for today's volume.

  • Emergency access. Make sure road width, intersections and future development allow appropriate access for police, fire, ambulances and other emergency vehicles.

  • Speed and pedestrian safety. Review speed limits where conditions warrant it and consider traffic-calming measures, sidewalks and safer pedestrian connections.

  • Better standards for future development. Growth should not create tomorrow's infrastructure problems. Road width, sidewalks, drainage, rights-of-way and connections to existing neighborhoods should be considered before development is approved.

  • Stronger planning for drainage and ditches. Roads and drainage are connected. Maintaining ditches, culverts and runoff systems should be part of our infrastructure strategy—not an afterthought.

Supporting Our Public Works Department

Ward is a growing city with a small public works team whose employees wear many hats. We cannot expect a small department to possess every piece of specialized equipment or every engineering and road-construction skill internally.

Good leadership means recognizing when we can handle something ourselves—and when bringing in specialized expertise will save the city money in the long run.

Before Ward spends thousands of dollars on a repair, I want us to be confident we're asking contractors to fix the right problem.

Growth Must Help Pay for Growth

As new neighborhoods are developed, I want Ward to carefully examine whether our development standards adequately protect existing residents.

New growth shouldn't leave taxpayers footing the bill later for inadequate streets, sidewalks, drainage or infrastructure that should have been properly planned from the beginning.

The Bigger Goal

This isn't about promising that every pothole or road problem can be fixed overnight. It can't.

It's about creating a system.

Assess it. Prioritize it. Budget for it. Schedule it. Fix it correctly. Maintain it.

Ward deserves a road and infrastructure plan that looks beyond the next repair and prepares our community for the next 10–20 years of growth.

Planning Ahead — instead of always catching up.